Introduction to DCMA 14-points Schedule Quality Metric and How it can help improve your Projects.
Abstract
Title Page and Disclaimer
What is the DCMA 14-points Assessment about?
Impacts of poor-quality schedule
Fundamental Schedule Quality Questions to address
DCMA 14 Course - Video Presentation
DCMA 14 Summary - Video Presentation (24:27)
Dissecting the DCMA 14-Points Schedule Quality Metric Criteria
DCMA-14.1 Logic (Checking Network Logic)
DCMA14.2- Leads (Negative Lags)
DCMA14.3-Lags (Positive Lags)
DCMA14.4A-SS_FF (Relationship Types)
DCMA14.4B-SF (Relationship Types)
DCMA14.5-Hard Constraints (Mandatories)
DCMA14.6-High Float (Total Float)
DCMA14.7-Negative Float
DCMA14.8-High Duration (Long Durations)
DCMA14.9A-Invalid Dates (Invalid Forecast Dates)
DCMA14.9B-Invalid Dates (Invalid Actual Dates)
DCMA14.10-Resource Loading
DCMA14.11-Missed Activities (Activity Slippage)
DCMA14.12-Critical Path Integrity (CP Test)
DCMA14.13-Critical Path Length Index (CPLI)
DCMA14.14-Baseline Execution Index (BEI)
Typical Weighing applied to Deltek Acumen Fuse Scores
DCMA14 Score Weightings
Conclusion
Concluding statement
References
Bibliography