This course was created with the
course builder. Create your online course today.
Start now
Create your course
with
Autoplay
Autocomplete
Previous Lesson
Complete and Continue
Introduction to DCMA 14-points Schedule Quality Metric and How it can help improve your Projects.
Abstract
Title Page and Disclaimer
What is the DCMA 14-points Assessment about?
Impacts of poor-quality schedule
Fundamental Schedule Quality Questions to address
DCMA 14 Course - Video Presentation
DCMA 14 Summary - Video Presentation (24:27)
Dissecting the DCMA 14-Points Schedule Quality Metric Criteria
DCMA-14.1 Logic (Checking Network Logic)
DCMA14.2- Leads (Negative Lags)
DCMA14.3-Lags (Positive Lags)
DCMA14.4A-SS_FF (Relationship Types)
DCMA14.4B-SF (Relationship Types)
DCMA14.5-Hard Constraints (Mandatories)
DCMA14.6-High Float (Total Float)
DCMA14.7-Negative Float
DCMA14.8-High Duration (Long Durations)
DCMA14.9A-Invalid Dates (Invalid Forecast Dates)
DCMA14.9B-Invalid Dates (Invalid Actual Dates)
DCMA14.10-Resource Loading
DCMA14.11-Missed Activities (Activity Slippage)
DCMA14.12-Critical Path Integrity (CP Test)
DCMA14.13-Critical Path Length Index (CPLI)
DCMA14.14-Baseline Execution Index (BEI)
Typical Weighing applied to Deltek Acumen Fuse Scores
DCMA14 Score Weightings
Conclusion
Concluding statement
References
Bibliography
Concluding statement
Lesson content locked
If you're already enrolled,
you'll need to login
.
Enroll in Course to Unlock